Renovation in Alcúdia

A large share of the property here earns its money for part of the year, which means the work has a deadline rather than a duration. Everything about how the job is planned follows from that.

Bathroom stripped to bare walls in a Mallorcan rental property with boxed tiles standing ready

The date is the constraint, not the scope

On a home the programme is a preference and can slip a fortnight without much cost. On a property that is let, the season starts whether the bathroom is finished or not, and a week of overrun is a week of lost income plus whatever it does to the bookings already taken. That turns the finish date into the fixed point and everything else into a variable.

The practical consequence is that the booking comes before the specification. The winter window is short, every owner on this coast wants the same weeks in it, and companies that hold dates reliably are committed early. Owners who wait until the design is perfect regularly find the design ready and the calendar full.

It also changes what a sensible scope looks like. Work that can be stopped cleanly and resumed next winter is worth separating from work that cannot, so that if something slips it slips into a phase rather than into the season. Any company used to letting property will help draw that line if asked.

What planning around a season involves

  • Booking the company before the specification is finished
  • A finish date treated as fixed, with the scope flexed instead
  • Long lead items ordered early, because deliveries decide the date
  • Work split into what can pause and what cannot
  • Bathrooms and kitchens, which take the hardest use in a let property
  • Finishes chosen for durability rather than for delicacy
  • Furniture, equipment and the time to install it after the trades leave
  • Cleaning and making good built into the programme, not after it
  • A contingency in time rather than only in money
  • Somebody local able to check progress through the winter

Most asked for here

Hotels and hospitality

The same problem at a larger scale, written for operators.

Apartment renovation

Flats in the low-rise coastal blocks.

Property managers

For owners whose property is run by somebody else.

Nearby areas

Pollensa

Town houses of local stone, and rural fincas across the countryside behind them.

Muro

Village houses with deep plans, and a water table that sits close to the slab.

Sa Pobla

Land that was drained, and ground floors that still remember it.

How your request reaches a company

Mallorca Renovation is a comparison service. A request for work that has to be ready for the season goes to the renovation and building companies on our list; they quote the work and carry it out, and any agreement is between you and the company you pick.

  1. 01

    Describe the job

    Tell us the property, roughly what you want and where it is. Photographs and a rough plan help, though neither is required.

  2. 02

    We match it

    The request goes to companies that work in your area and take on this kind of job at this size.

  3. 03

    They quote you

    Each company contacts you directly with its own price, timing and approach. We do not set any of it.

  4. 04

    You compare and choose

    Put the quotes side by side and take the one you want, or none of them. Using the site costs you nothing.

When should winter work be booked?

Earlier than the specification is ready, which feels wrong and is correct. The window is short and shared by everybody on this coast, so securing dates is what makes the rest of the planning worth doing.

What happens if the work overruns?

It is worth agreeing in advance rather than discovering. Splitting the scope so that a slip lands in a phase rather than in the season is the practical protection, and it is easier to arrange at the start than in March.

Are letting finishes different from domestic ones?

Usually more durable and more neutral, because they take heavier use from more people. Companies that work on let property will say plainly which specifications survive a season and which do not.

Get quotes against a fixed finish date

Describe the property and the date it has to be ready, and compare several prices.

Mallorca Renovation