Detached Mallorcan villa under full renovation with scaffolding and the terrace bare to its screed

Villa Renovation in Mallorca

A full villa renovation touches almost everything: layout, services, surfaces and often the structure itself. Describe what you have and what you want, and we pass the request to companies on Mallorca that take on work at that scale.

Mallorcan villa interior mid-renovation with chased walls and a new steel beam over an opening

What a full villa renovation usually includes

A complete villa renovation can include demolition, layout changes, structural alterations, new electrical and plumbing, kitchens, bathrooms, flooring, windows and final finishes, along with whatever the outside needs to match. Few projects contain all of it, and the ones that do are closer to a complete refurbishment than a renovation.

The line matters when you are comparing prices. A quote that assumes the electrical installation stays and a quote that assumes it is replaced are not describing the same job, and the difference is rarely small on a villa built before the current regulations.

The same is true of the structure. Removing a wall to open a kitchen into a living room is a different piece of work depending on whether that wall is holding the floor above it up, and the answer is not always obvious from looking at it.

What a villa renovation request usually covers

  • A walk through the property and what is being kept
  • Demolition and removal of what is not
  • Layout changes, and any structural work they require
  • Electrical installation, brought to current standards
  • Plumbing, drainage and hot water
  • Kitchen and bathrooms
  • Flooring, plaster and paint
  • Windows, doors and shutters
  • Terraces, pool surrounds and the outside spaces the rooms open onto

How a villa renovation usually runs

The order is not decorative. Work done out of sequence gets taken up again.

  1. 01

    Survey and scope

    Someone walks the property, works out what is structural and what is not, and writes down what the job actually contains.

  2. 02

    Permissions

    What the work needs depends on what it touches. Structural changes and anything altering the exterior are treated differently from internal finishes.

  3. 03

    Strip out

    Demolition and removal, which is also when the surprises appear: old wiring, damp, and structure that is not where the drawings said.

  4. 04

    First fix

    Structure, electrical and plumbing, before anything is closed up.

  5. 05

    Second fix and finishes

    Kitchens, bathrooms, flooring, plaster, paint, joinery.

  6. 06

    Handover

    Snagging, certificates for the installations that need them, and the paperwork for anything that was permitted.

Often part of the same project

Structural work

When the layout changes need more than a new opening.

Extensions

Where the villa needs more floor area rather than a better one.

Turnkey renovation

If you are not on the island while the work runs.

How your request reaches a company

Mallorca Renovation is a comparison service. A request for a villa renovation goes to the renovation and building companies on our list; they quote the work and carry it out, and any agreement is between you and the company you pick.

  1. 01

    Describe the job

    Tell us the property, roughly what you want and where it is. Photographs and a rough plan help, though neither is required.

  2. 02

    We match it

    The request goes to companies that work in your area and take on this kind of job at this size.

  3. 03

    They quote you

    Each company contacts you directly with its own price, timing and approach. We do not set any of it.

  4. 04

    You compare and choose

    Put the quotes side by side and take the one you want, or none of them. Using the site costs you nothing.

How long does a villa renovation take?

It depends on how much of the property is being touched and on whether the structure changes. A full villa renovation is usually measured in months rather than weeks, and the permitting and the strip out often take longer than people expect because that is when the unknowns surface.

Can I live in the villa while the work happens?

On a partial renovation sometimes, if the work can be phased around a habitable part of the property. On a full renovation with the services replaced, generally not.

Do I need an architect?

It depends on what the work touches. Changes to the structure or the exterior are treated differently from internal finishes, and a company quoting the job will tell you what it needs before it can price it. Ask early, because it affects the programme more than the price.

Should I get more than one quote?

Yes, and against the same written description. Two prices for the same villa can differ substantially simply because one includes the electrical installation and the other assumes it stays.

Get comparable villa quotes

Describe the villa once and let several companies price it against the same brief.