Commercial Renovation in Mallorca
Hotels, restaurants, offices and retail space, where the work has to fit around a business rather than around a household. Describe the property, the trading calendar and the scope, and we pass the request to renovation and building companies on Mallorca that work to that kind of programme.
What makes commercial work different
The date. A hotel reopens on a fixed day, a restaurant loses money for every week it is shut, and an office has people who still have to sit somewhere. On a house the programme is a preference. On commercial property it is usually the constraint that everything else gets arranged around.
The season follows from that. Work on a seasonal property has to fall in the window between one season and the next, which means the companies that hit dates reliably are booked early and the work is compressed into the months when neither the weather nor the supply chain is helping.
The third difference is who signs. A commercial scope is normally agreed between more people than a domestic one, so a decision a homeowner makes in an afternoon can take a fortnight. That belongs in the programme from the beginning rather than being discovered halfway through it.
Commercial work companies are usually asked about
- Hotel rooms, bathrooms and common areas between seasons
- Restaurant and bar interiors, kitchens and extraction
- Office fit out, partitioning and meeting rooms
- Retail interiors and shopfronts
- Facades, terraces and outdoor seating
- Electrical, cooling and ventilation to a commercial load
- Accessibility, and the building changes that go with it
- Phasing, so that part of the property keeps trading
- Night and out of hours working where the day is not available
How a commercial renovation usually runs
The programme is built backwards from the opening, which is the opposite of how a domestic job is planned.
-
01
The date first
Fix the reopening date and work backwards from it. A programme built forwards from a start date is a programme that finds out about its problem at the end.
-
02
Scope and phasing
Decide what closes, what keeps trading and in what order. Phasing costs money and buys revenue, and that trade is worth making deliberately rather than by default.
-
03
Technical work and permissions
What the work needs depends on the use of the building and on what is being changed. Establish it before the programme is committed rather than during it.
-
04
Strip out
Usually the fastest phase, and the one most exposed to surprises in an older building.
-
05
Services and structure
Electrical, cooling, ventilation and any structural change, all before finishes.
-
06
Fit out
Finishes, joinery, kitchens and equipment, which is where lead times rather than labour decide the date.
-
07
Handover and opening
Snagging against a date that does not move, plus the certificates the installations need.
Related on this site
Turnkey renovation
Structural work
Hotels and hospitality
How your request reaches a company
Mallorca Renovation is a comparison service. A request for a commercial renovation goes to the renovation and building companies on our list; they quote the work and carry it out, and any agreement is between you and the company you pick.
-
01
Describe the job
Tell us the property, roughly what you want and where it is. Photographs and a rough plan help, though neither is required.
-
02
We match it
The request goes to companies that work in your area and take on this kind of job at this size.
-
03
They quote you
Each company contacts you directly with its own price, timing and approach. We do not set any of it.
-
04
You compare and choose
Put the quotes side by side and take the one you want, or none of them. Using the site costs you nothing.
When should a seasonal refurbishment be booked?
Earlier than feels necessary. The window between seasons is short, every operator wants the same weeks in it, and the companies that hold dates reliably are committed long before the season ends.
Can the business stay open during the work?
Sometimes, in phases, and it always costs more than closing. Whether it is worth it is an arithmetic question rather than a building one: set the extra cost of phasing against the revenue a closure would lose.
Who handles the technical and regulatory side?
It varies by company and it is worth asking directly. What matters is that one named person is responsible for it and that you know who, because on commercial property this is the part that moves opening dates.
Are commercial quotes different from domestic ones?
The building work is similar. The programme, the phasing and the out of hours working are not, and they are where two commercial quotes for the same job diverge from each other. Compare what each one includes rather than the totals.
Get comparable commercial quotes
Describe the property and the date once, and let several companies price the same scope.