Mobile crane in a Mallorcan hillside street lifting over the roof of a terraced villa

Renovation in Portals Nous

The plots here step down toward the water, and a good number of them can only be reached over the top of something. Where a machine can stand, and for how long, tends to decide the order the work happens in. Tell us how the plot is reached and we match it to renovation and building companies set up for it.

Crated glazing, a pool shell and pallets of stone staged on a Mallorcan hillside plot terrace

What has to be lifted, and when

On a stepped plot the working level is often below the road, so anything heavy arrives by crane rather than through a gate. That is normal here and it is expensive per visit, which changes the planning: everything that needs lifting gets lifted in as few operations as possible, and the sequence of the whole job bends around those days.

It affects choices that look unrelated. A pool shell, a large glazed unit, roof material, a plant unit or a stone slab all have to be on site before the access route closes behind them, so specification decisions have to be final earlier than they would be on a flat plot. A late change to a large item is not a change of mind here, it is another crane.

The road matters as much as the plot. A lift usually needs the street closed or partly closed for a period, which has to be arranged and which the neighbours will notice. Companies that work on this coast handle it routinely; it is worth asking how many lifts a quote assumes, because that number is a real part of the price.

What tends to be planned around the lifting

  • How many crane days the programme assumes
  • Where the machine stands, and what has to be closed while it does
  • Large glazed units, which cannot be carried down steps
  • Plant, tanks and anything mechanical that will not fit a stair
  • Pool shells and heavy landscape material
  • Stone and tile in quantity, delivered before access closes
  • Waste going up rather than out
  • Scaffolding on a plot that steps, which is its own design
  • Neighbours either side, and how long the street is affected
  • A specification frozen earlier than on a level site

Most asked for above the marina

Villa renovation

The whole property, on a plot that works in levels.

Extensions

Building out or down on a plot that has already used its width.

Structural work

Terraces, retaining and anything cut into the slope.

Nearby areas

Bendinat

Hillside villas of a certain age, with wiring and pipework of the same age.

Costa d’en Blanes

Every level a retaining decision, taken before anything else is decided.

Palmanova

Low-rise blocks from the tourist decades, where the community votes on the facade.

How your request reaches a company

Mallorca Renovation is a comparison service. A request for a renovation on a stepped plot goes to the renovation and building companies on our list; they quote the work and carry it out, and any agreement is between you and the company you pick.

  1. 01

    Describe the job

    Tell us the property, roughly what you want and where it is. Photographs and a rough plan help, though neither is required.

  2. 02

    We match it

    The request goes to companies that work in your area and take on this kind of job at this size.

  3. 03

    They quote you

    Each company contacts you directly with its own price, timing and approach. We do not set any of it.

  4. 04

    You compare and choose

    Put the quotes side by side and take the one you want, or none of them. Using the site costs you nothing.

How many crane visits should a quote include?

As few as the job allows, and the number should be stated. It is one of the clearest differences between a quote written by somebody who has worked on this coast and one written from a floor plan.

Why do I have to choose the glazing so early?

Because a large unit has to arrive while the access route is still open, and after that it cannot get in without another lift. On a stepped plot the ordering deadline is set by the site, not by the supplier.

Does the street have to be closed?

Usually for a period on lifting days, and it is arranged rather than improvised. Companies working here do it regularly; what matters is that the time and the arranging are in the price.

Get quotes that price the access properly

Describe the plot and the approach once, and let several companies price the same job.

Mallorca Renovation