27.07.2026 4 min

Villa Renovation Checklist for Mallorca

Bare Mallorcan villa interior at first fix with conduit and pipework run through the walls

Key takeaways

  • Work down this in order. Items near the top make the ones below them cheaper.
  • Anything marked as in writing is worth having in writing.
  • Nothing here needs a technical vocabulary to ask for.
  • If a company will not answer an item, that is itself an answer.

This is the short version of everything else on this site, arranged so it can be worked through rather than studied. It assumes a villa and it applies with small changes to anything else.

Before you speak to anybody

  • Write down everything you want changed, in your own words, without ranking it.
  • Separate what is forced (failing services, water coming in, movement) from what is wanted.
  • Decide roughly when you need it finished, and whether that date can move.
  • Decide whether you can be out of the property, and for how long.
  • Find any drawings, certificates or paperwork the property came with.
  • Note how a lorry would reach the property, and where a skip could stand.

Establish what you have

  • Get the structure looked at if the layout is changing. In writing.
  • Establish whether the electrical installation is being kept or replaced.
  • Establish the same for plumbing, drainage and hot water.
  • Have any damp traced to a source rather than treated where it shows.
  • Check the roof, and on older property the timber, where it bears rather than from below.
  • On rural property, establish water, power, waste treatment and the access track.
  • In a flat, establish what the community of owners allows and how long it takes.
  • If an extension is part of the plan, establish what the plot allows first.

Write the scope

  • One document, plain language, describing what the job contains.
  • State explicitly whether the services are in or out.
  • State what is being kept, not only what is being changed.
  • Say what access is available, honestly.
  • Send the identical document to every company.
  • Ask each of them to list what they have excluded.

Before you sign anything

  • Compare what each quote includes before comparing the totals.
  • Ask what each company expects the work to need, who arranges it, and whether it is in the price.
  • Ask what happens to the price when something is found behind a wall.
  • Ask who the single point of contact is, and who covers when they are away.
  • Ask which parts are subcontracted and who holds those contracts.
  • Agree how payments are staged, and against what evidence of progress.
  • Agree the reporting rhythm, in writing, including what counts as urgent.
  • Identify the long lead items and agree when they will be ordered.

While the work runs

  • Make the choosable decisions before the trade is waiting for them.
  • Visit around first fix if you can, before anything is closed up.
  • Photograph what is behind the walls before they are closed. Keep the photographs.
  • Keep certificates and paperwork as they are issued, not at the end.
  • Raise a concern in the week you have it rather than at handover.

At handover

  • Walk it with a list and expect to have one. A snagging list is normal.
  • Collect the certificates the installations need.
  • Get a record of what is buried where, while somebody still remembers.
  • Get instructions for anything mechanical that was installed.
  • Agree what happens about anything that appears in the first months.

The questions in the signing section are covered in more depth in questions to ask a renovation contractor, and the whole sequence is explained in the complete guide.

Is this overkill for a small project?

The establishing and the written scope are worth doing at any size, because they are what make quotes comparable. The reporting and payment items matter more the longer the project runs.

What if a company will not answer some of these?

Take it as information. Every item here is answerable by a company that works on this island, and reluctance to put an answer in writing usually means the answer is not what you would want.

Do I need all of this before getting a price?

No. The first two sections are enough to get comparable quotes. The rest is what to settle between choosing a company and letting them start.

This might be interesting to you

Mallorcan building site standing idle with scaffolding up and material wrapped and stacked
22.07.2026 4 min

How Long Does a Renovation Take in Mallorca?

Where the time actually goes on an island renovation, and why most of the delay happens before anybo...

Old Mallorcan house standing empty with a part-collapsed roof and its thick stone walls intact
03.08.2026 4 min

Renovation or Rebuild? Deciding in Mallorca

The comparison is rarely just two prices, because what may be built on the plot now is not always wh...

Opened wall in an old Mallorcan house showing a rotten timber lintel and a damp rubble core
05.08.2026 5 min

Common Problems When Renovating Older Property in Mallorca

What tends to be found once the walls are open on island property, what each discovery actually mean...

Bare Mallorcan room at second fix with a stepladder in the corner and tools set down on the floor
31.08.2026 4 min

Questions to Ask a Renovation Contractor in Mallorca

Fifteen questions worth asking before you agree anything, and what each answer actually tells you ab...

Mallorca Renovation